Ongoing Projects
University of Arizona Commencement Flooring
Arizonan Trading and Supply Co. is currently supporting the University of Arizona’s 2025 commencement ceremony by supplying and installing I-Trac flooring in the Arizona Stadium. This large-scale project was initiated to accommodate what is reported as the largest graduating class in the university’s history, approximately 9,000 students. The project includes full delivery, layout and professional installation coordination of high-durability flooring suitable for high foot traffic and stadium logistics.
Arizona Stadium | May 9 – May 17, 2025
Completed Projects
2024 Arizona Bowl – Driveable Field Flooring
Arizonan Trading and Supply Co. provided special driveable flooring for the 2024 Arizona Bowl. The solution was designed to support a live post-game field performance by Snoop Dogg, who drove his lowrider onto the stadium turf. This specialty flooring allowed for both durability and visual appeal, supporting vehicle load without damaging the underlying surface.
Arizona Stadium | December 28, 2024